Custom PVC ductwork improves industrial ventilation by optimizing airflow, reducing unnecessary resistance and providing corrosion resistance in suitable applications. Engineers…
Field Joints in Large PVC Duct Systems: What Must Be Planned Before Installation
Field joints in large PVC duct systems should be planned before fabrication because shipping limits, access, rigging, joint method, alignment,…
Condensation in Corrosive Exhaust Duct Systems: What Engineers Need to Consider
That change matters. Condensate can collect at elbows, transitions, low points, sagging horizontal runs, and other areas where the system…
PVC Duct Installation Checklist for Industrial Exhaust Systems
Industrial PVC duct installation should be checked against approved drawings, manufacturer instructions, support requirements, thermal movement, joint procedures, equipment loads,…
Common Failure Points in Corrosive Exhaust Duct Systems
Corrosive exhaust duct failure can involve more than material choice alone. Chemistry, temperature, joints, supports, thermal movement, condensate, and pressure…
What Information Does a Duct Fabricator Need to Quote a Custom Duct System?
To quote a custom duct system, a fabricator needs the application and exhaust type, chemical constituents and concentrations, normal and…
Large-Diameter PVC Duct: When Custom Fabrication Makes Sense
Custom fabrication is not simply a matter of making the same duct larger. As diameter increases, engineers need to review…






